LHCb Silicon Tracker - Photos from TT Station Assembly and Installation
Click on the thumbnails to see full-sized pictures
Installation of x layers on the A side (March 15, 2008)
View of the completed u-layer
|
Stefan picking up a new module...
|
... and carrying it to the detector
|
Installing a module from the VELO side
|
Mounting back the insulation wall on the VELO side
|
Mounting back the insulation wall on the VELO side
|
Jeroen picking up a module for the Magnet side ...
|
... and carrying it to the detector
|
Angi fixing the lower end of the module
|
Stefan fixing the upper end of the module
|
Angi working while Jeroen inspects the installed modules
|
Jeroen fixes the last module himself
|
Jeroen fixes the last module himself
|
Final inspection
|
Stefan mounting the beam-pipe insulation piece
|
Stefan mounting the beam-pipe insulation piece
|
|
|
|
|
|
|
Installation of the second batch of detector modules (February 22, 2008)
Installing the first modules on the Cryo side
|
First modules on the Cryo side
|
Connecting the jumper cables
|
Modules around the LHC beam pipe
|
Half-module above the LHC beam pipe
|
View through the magnet
|
Access side, completed v-layer
|
Access side, top, v-layer
|
Access side, completed u-layer
|
Access side, completed u-layer
|
Access side, u-layer, bottom
|
Access side, u-layer, top
|
Installation of the first eight detector modules (February 1, 2008)
Taking the faaast lift down
|
Angi and Stefan preparing the workplace
|
Installing the first of the modules
|
Installing the first of the modules
|
Installing the first of the modules
|
Installing the first of the modules
|
Installing module number three
|
The fifth module from the VELO side
|
The fifth module from the VELO side
|
The fifth module from the VELO side
|
View of the installed modules
|
View of the installed modules
|
Close-up of the lower half of the modules
|
Close-up of the lower hybrids
|
Close-up of the upper hybrids
|
Jeroen getting ready for his work
|
... connecting the upper jumper cables
|
... then the lower jumper cables
|
Lower hybrids with jumper cables connected
|
Upper hybrids with jumper cables connected
|
More jumper cables waiting for more modules
|
Readout cables plugged into their digitizer cards
|
Views of closed TT station (August 23, 2007)
Installation of optical fibres (July 20-27, 2007)
Service-box rack wiwth cables and fibres
|
Optical patch-panel on platform P3
|
Rack P1A03
|
TELL1 boards in the counting house
|
Optical patch panel in the counting house
|
HV patch panel in the counting house
|
Installation of the first detector module (July 9-13, 2007)
Connecting cooling lines
|
|
|
Leveling of cooling plates
|
The module arrives
|
Mounting the module
|
Mounting the module
|
Mounting the module
|
Mounting the module
|
Mounting the module
|
Angi posing with the module
|
The module on its own
|
Mounting the beam-pipe insulation
|
Close-up of the beam-pipe insulation piece
|
Bottom end of the installed module
|
Lower hybrids
|
Photogrammetry of Access side (June 11-15, 2007)
Open half-station with targets
|
Jean-Christophe taking pictures
|
Sandra clearing the view
|
Stefan and Angi changing the targets
|
Photogrammetry of Cryo side (June 6, 2007)
|
Cooling balconies with targets
|
Open half-station with all targets
|
Open half-station with all targets
|
Jean-Christophe taking pictures
|
Sandra analysing the data
|
Closed half-station with all targets
|
HV and LV cables on Cryo side
|
Mounting connectors on bias-voltage cables (May 21-25 and June 11-15, 2007)
Patch panel
|
Mounting connectors on platform P3
|
Mounting connectors close to detectors
|
Patch panel with cables connected
|
|
|
Leak test using CO2
|
Modified cable tray
|
Mounting connectors on IT cables
|
Mounting connectors on IT cables
|
Labelling the cables
|
Crimping the LV lugs
|
Cables Access-side bottom
|
Nitrogen supply
|
Cooling by-pass
|
|
Low-voltage cables (April 23-26, 2007)
Service-Boxes
|
Service-Boxes
|
Platform P3
|
Platform P3
|
Cooling pipes (March 26, 2007)
|
Purge valve
|
Access side
|
Cryo side
|
Insulation
|
|
|
Adjusting and connecting cables in the flexible cable chains (February 12-17, 2007)
Stefan and Angie at work
|
Cable tray underneath the C-frame
|
Upper support rail and beam-pipe protection
|
View from the Cryo-side
|
View from inside the LHCb magnet
|
View from inside the LHCb magnet
|
Keep you hands off our detector!
|
Jeroen posing in front of the station
|
Angie posing in front of the station
|
Installing Kapton "jumper cables" (February 2007)
Cryo-top-magnet
|
Cryo-top-VELO
|
Cryo-bottom-magnet
|
Cryo-bottom-VELO
|
Access-top-magnet
|
Access-top-VELO
|
Access-bottom-magnet
|
Access-bottom-VELO
|
|
|
Closing the detector box (February 5-9, 2007)
Installing the flexible cable chains in LHCb (December 13-15, 2006)
Cable-chain supports mounted on the magnet
|
Transport box with cable chains
|
Unpacking the cable chain
|
|
|
|
|
|
Kapton feed-through cables and patch panels
|
|
Open C-frame and magnet
|
Closed C-frame and cable chains
|
C-frame on the "C"ryo side
|
Sliding towards the beam pipe
|
|
Installing the C-Frames in LHCb (December 11/12, 2006)
|
Lowering the transport box
|
Lifting the C-frame out of the box
|
|
|
|
Lifting the C-frame over the magnet
|
Rolf holding the C-frame
|
|
|
|
Lifting the C-frame into an upright position
|
|
Stefan fixing the upper gliders
|
|
|
|
Angela and the C-frame
|
|
C-frame on the Access side
|
C-frame on the Cryo side
|
Has the beam pipe gone down the drain?
|
|
|
Hard stops
|
View from the VELO
|
View from the VELO
|
Test installation in Zürich (November 2006)
|