LHCb Silicon Tracker - Photos from TT Station Assembly and Installation

Click on the thumbnails to see full-sized pictures

Installation of x layers on the A side (March 15, 2008)


View of the completed u-layer

Stefan picking up a new module...

... and carrying it to the detector

Installing a module from the VELO side

Mounting back the insulation wall on the VELO side

Mounting back the insulation wall on the VELO side

Jeroen picking up a module for the Magnet side ...

... and carrying it to the detector

Angi fixing the lower end of the module

Stefan fixing the upper end of the module

Angi working while Jeroen inspects the installed modules

Jeroen fixes the last module himself

Jeroen fixes the last module himself

Final inspection

Stefan mounting the beam-pipe insulation piece

Stefan mounting the beam-pipe insulation piece







Installation of the second batch of detector modules (February 22, 2008)


Installing the first modules on the Cryo side

First modules on the Cryo side

Connecting the jumper cables

Modules around the LHC beam pipe

Half-module above the LHC beam pipe

View through the magnet

Access side, completed v-layer

Access side, top, v-layer

Access side, completed u-layer

Access side, completed u-layer

Access side, u-layer, bottom

Access side, u-layer, top

Installation of the first eight detector modules (February 1, 2008)


Taking the faaast lift down

Angi and Stefan preparing the workplace

Installing the first of the modules

Installing the first of the modules

Installing the first of the modules

Installing the first of the modules

Installing module number three

The fifth module from the VELO side

The fifth module from the VELO side

The fifth module from the VELO side

View of the installed modules

View of the installed modules

Close-up of the lower half of the modules

Close-up of the lower hybrids

Close-up of the upper hybrids

Jeroen getting ready for his work

... connecting the upper jumper cables

... then the lower jumper cables

Lower hybrids with jumper cables connected

Upper hybrids with jumper cables connected

More jumper cables waiting for more modules

Readout cables plugged into their digitizer cards

Views of closed TT station (August 23, 2007)






Installation of optical fibres (July 20-27, 2007)


Service-box rack wiwth cables and fibres

Optical patch-panel on platform P3

Rack P1A03

TELL1 boards in the counting house

Optical patch panel in the counting house

HV patch panel in the counting house

Installation of the first detector module (July 9-13, 2007)


Connecting cooling lines



Leveling of cooling plates

The module arrives

Mounting the module

Mounting the module

Mounting the module

Mounting the module

Mounting the module

Angi posing with the module

The module on its own

Mounting the beam-pipe insulation

Close-up of the beam-pipe insulation piece

Bottom end of the installed module

Lower hybrids

Photogrammetry of Access side (June 11-15, 2007)


Open half-station with targets

Jean-Christophe taking pictures

Sandra clearing the view

Stefan and Angi changing the targets

Photogrammetry of Cryo side (June 6, 2007)



Cooling balconies with targets

Open half-station with all targets

Open half-station with all targets

Jean-Christophe taking pictures

Sandra analysing the data

Closed half-station with all targets

HV and LV cables on Cryo side

Mounting connectors on bias-voltage cables (May 21-25 and June 11-15, 2007)


Patch panel

Mounting connectors on platform P3

Mounting connectors close to detectors

Patch panel with cables connected



Leak test using CO2

Modified cable tray

Mounting connectors on IT cables

Mounting connectors on IT cables

Labelling the cables

Crimping the LV lugs

Cables Access-side bottom

Nitrogen supply

Cooling by-pass


Low-voltage cables (April 23-26, 2007)


Service-Boxes

Service-Boxes

Platform P3

Platform P3

Cooling pipes (March 26, 2007)



Purge valve

Access side

Cryo side

Insulation



Adjusting and connecting cables in the flexible cable chains (February 12-17, 2007)


Stefan and Angie at work

Cable tray underneath the C-frame

Upper support rail and beam-pipe protection

View from the Cryo-side

View from inside the LHCb magnet

View from inside the LHCb magnet

Keep you hands off our detector!

Jeroen posing in front of the station

Angie posing in front of the station

Installing Kapton "jumper cables" (February 2007)


Cryo-top-magnet

Cryo-top-VELO

Cryo-bottom-magnet

Cryo-bottom-VELO

Access-top-magnet

Access-top-VELO

Access-bottom-magnet

Access-bottom-VELO



Closing the detector box (February 5-9, 2007)


















Installing the flexible cable chains in LHCb (December 13-15, 2006)


Cable-chain supports mounted on the magnet

Transport box with cable chains

Unpacking the cable chain






Kapton feed-through cables and patch panels


Open C-frame and magnet

Closed C-frame and cable chains

C-frame on the "C"ryo side

Sliding towards the beam pipe


Installing the C-Frames in LHCb (December 11/12, 2006)



Lowering the transport box

Lifting the C-frame out of the box




Lifting the C-frame over the magnet

Rolf holding the C-frame




Lifting the C-frame into an upright position


Stefan fixing the upper gliders




Angela and the C-frame


C-frame on the Access side

C-frame on the Cryo side

Has the beam pipe gone down the drain?



Hard stops

View from the VELO

View from the VELO

Test installation in Zürich (November 2006)
























See also:

LHCb Silicon Tracker photos
LHCb Silicon Tracker material for publications


Go back to: Silicon Tracker Home Page, LHCb Home Page
Page maintained by olafs@physik.uzh.ch, last modfied on July 16, 2008