LHCb Silicon Tracker Presentations

2011

2010

Performance of the LHCb Silicon Tracker in pp Collisions at the LHC
M. Tobin, 2010 IEEE Nuclear Science Symposium, Knoxville, Tennessee, United States Of America, 30 Oct - 6 Nov 2010
First performance results for the LHCb Silicon Tracker
J. Anderson, 12th Topical Seminar on Innovative Particle and Radiation Detectors, Siena, Italy, 7 - 10 Jun 2010
LHCb Silicon Tracker operations and performance with first data
M. Needham, 19th International Workshop on Vertex Detectors, Loch Lomond 6 - 11 Jun 2010
The LHCb Silicon Tracker, first operational results
D. Esperante, International Instrumentation and Measurement Technology Conference, Austin, USA, 3-6 May 2010
Commissioning and Performance of the LHCb Silicon Tracker
J. van Tilburg, 12h Vienna Conference on Instrumentation

2009

Performance of the LHCb Silicon Tracker with first data
M.Needham, ICATPP, Como, October 5-9, 2009
Commissioning of the LHCb Silicon Tracker with the LHC injection test
M.Knecht, RD09, Firenze, September 30-October 2, 2009
Silicon Tracker Status
M.Needham, LHCb week, Firenze, September 23, 2009
First Operational Experience from the LHCb Silicon Tracker
A.Gallas, STD7, Hiroshima, August 29-September 1, 2009
Silicon Tracker Status
M.Needham, LHCb week plenary session CERN, May 25-29, 2009
LHCb Silicon Tracker DAQ and ECS Online Systems
P. Rodrigues , 16th IEEE NPSS Real Time Conference Beijing 2009
Installation and operation of the LHCb Silicon Tracker detector
D.Esperante, TIPP09, Tsukuba, March 11-17, 2009
Silicon Tracker Status
M.Needham, LHCb week plenary session, CERN, February 25, 2009

2008

Tracking stations alignment with Kalman tracks at LHCb
L.Nicolas , IEEE Nuclear Science Symposium Dresden, Germany, October 21, 2008
Silicon Tracker Status
M.Needham , LHCb week plenary session, CERN, November 26, 2008
The LHCb Silicon Tracker: lessons learned (so far)
A.Vollhardt , TWEPP-08, Naxos, September 15, 2008
Silicon Tracker Status
M.Needham, LHCb week plenary session, CERN, September 2, 2008
Silicon Tracker Status
O.Steinkamp, LHCb week plenary session, CERN, April 24, 2008
Silicon Tracker Installation and Commissioning Status and Plans
O.Steinkamp, LHCb week plenary session, CERN, January 24, 2008

2007

Production and Quality Assurance of Detector Modules for the LHCb Silicon Tracker
O.Steinkamp for D.Volyanskyy, ICATPP, Como, October 8-12, 2007
Silicon Tracker Status Report
O.Steinkamp, LHCb week plenary session, St. Nectaire, September 12, 2007
Design and Production of the LHCb Silicon Tracker
R.Bernhard, Large-Scale Applications and Radiation Hardness of Semiconductor Detectors, Firenze, June 25-29, 2007
Silicon Tracker Status Report
O.Steinkamp, LHCb week plenary session, CERN, June 8, 2007
Silicon Tracker Status Report
O.Steinkamp, LHCb week plenary session, CERN, March 16, 2007
Design and Production of the LHCb Silicon Tracker
O.Steinkamp, VCI 2007, Vienna, Feb 18-24,2007

2006

Silicon Tracker Status Report
J.van Hunen, LHCb week plenary session, CERN, Dec 01, 2006
Silicon Tracker Status Report
F.Lehner, LHCb week plenary session, Heidelberg, Sep 15, 2006
Design and Production of the LHCb Silicon Tracker
O.Steinkamp, STD5, Carmel, Sep 11-15, 2006
Silicon Tracker Status Report
H.Voss, LHCb week plenary session, CERN, Jun 02, 2006
The LHCb Tracking System
J.van Hunen, Pisa Meeting on Frontier Detectors for Frontier Physics, La Biodola, May 21-27, 2006
Silicon Tracker Status Report
P.Vazquez, LHCb week plenary session, CERN, Mar 10, 2006

2005

Silicon Tracker Status Report
F.Lehner, LHCb week plenary session, CERN, Dec 2, 2005
FPGA based Signal Processing for the LHCb Vertex Detector and Silicon Tracker
G.Haefeli, VERTEX 2005, Lake Chuzenji, Nikko, Nov 9, 2005
Long Ladder Performance
O.Steinkamp, VERTEX 2005, Lake Chuzenji, Nikko, Nov 9, 2005
The LHCb Silicon Tracker
F.Lehner, ICATPP, Villa Olmo, Como, Oct 18, 2005
Design and Performance of the LHCb Silicon Tracker
K.Vervink, TIME 2005, Zürich, Oct 4, 2005
Silicon Tracker Status Report
J.Gassner, LHCb week plenary session, Barcelona, Sep 16, 2005
Hybrid Design, Procurement and Testing for the LHCb Silicon Tracker
F.Lehner, LECC 2005, Heidelberg, Sep 14, 2005
Production of the LHCb Silicon Tracker Readout Electronics
A.Vollhardt, LECC 2005, Heidelberg, Sep 13, 2005
Performance Studies & Production of the LHCb Silicon Tracker (poster)
S.Köstner, IWORID 2005, Grenoble, Jul 4-7, 2005
Status and Expected Performance of the LHCb Tracking System
M.Needham, Beauty 2005, Assisi, Jun 20-24, 2005
Silicon Sensor Probing and Radiation Studies for the LHCb Silicon Tracker
C.Lois-Gomez, European Symposium on Semiconductor Detectors, Wildbad Kreuth, Jun 13, 2005
A Radiation Tolerant Fibre Optic Readout System for the LHCb Silicon Tracker (poster)
A.Vollhardt, European Symposium on Semiconductor Detectors, Wildbad Kreuth, Jun 12-16, 2005
Silicon Tracker Status Report
O.Steinkamp, LHCb week plenary session, CERN, Jun 9, 2005
Silicon Tracker Status Report
O.Steinkamp, LHCb week plenary session, CERN, Mar 11, 2005

2004

Silicon Tracker Status Report
F.Lehner, LHCb week plenary session, CERN, Dec 2, 2004
Silicon Tracker Status Report
H.Voss, LHCb week plenary session, Chia, Sardegna Oct 02, 2004
The LHCb Silicon Tracker
H.Voss, IWoRID, Glasgow, Jul 25-29, 2004
Silicon Strip Detectors for the LHCb Experiment
O.Steinkamp, STD5,Hiroshima, Jun 14-17, 2004
The LHCb Silicon Tracker Project
J.Blouw, Innovative Particle and Radiation Detectors, Sienna, May 23-26, 2004
Silicon Tracker Status Report
U.Straumann, LHCb week plenary session, CERN, May 28, 2004
Design of the LHCb Silicon Tracker and the Common TELL1 board (poster)
M.Agari, F.Legger and O.Steinkamp, VCI2005, Vienna, Feb 16-21, 2004
Silicon Tracker Status Report
O.Steinkamp, LHCb week plenary session, CERN, Feb 27, 2004
Silicon Tracker Status Report
O.Steinkamp, LHCb comprehensive review, CERN, Jan 26, 2004

2003

The LHCb Silicon Tracker
A.Vollhardt, 2003 IEEE Nuclear Science Symposium, Oct 20-24, 2003
The LHCb Silicon Tracker
H.Voss, ICATPP, Como, Oct 6-10, 2003
The LHCb Silicon Tracker
M.Needham, Large-Scale Applications and Radiation Hardness of Semiconductor Detectors, Firenze, Sep 30-Oct 1, 2003
Trigger Tracker Design
M.Schmelling, 66th open LHCC session, CERN, Sep 24, 2003
LHCb Silicon Tracker
H.Voss, Vertex 2003, Sep 15 - 19, 2003
Silicon Tracker Status Report
O.Steinkamp, meeting with LHCC referees, CERN, Jun 25, 2003
Beetle - A Radiation Hard Readout Chip for the LHCb Experiment (poster)
D.Baumeister, Meeting on Advanced Detectors, Pisa, May 25-31, 2003
Towards the TT Station
M.Needham, LHCb week plenary session, CERN, May 22, 2003
Silicon Tracker Status Report
H.Voss, LHCb week plenary session, CERN, Feb 27, 2003
Silicon Tracker Status Report
O.Steinkamp, LHCb comprehensive review, CERN, Jan 27, 2003

2002

The LHCb Inner Tracker Technical Design
F.Lehner, 61st open LHCC session, CERN, Nov 27, 2002
The LHCb Silicon Tracker
F.Lehner, Vertex 2002, Hawaii, Nov 3-8, 2002
Inner Tracker TDR
O.Steinkamp, LHCb week plenary session, Cambridge, Sep 19, 2002
Development of the Inner Tracker Detector Electronics for LHCb
A.Vollhardt, Workshop on Electronics for LHC Experiments, Sep 9-13, 2002
Performance of the Beetle Readout Chip for LHCb
S. Löchner, Workshop on Electronics for LHC Experiments, Sep 9-13, 2002
LHCb Silicon: VELO and Inner Tracker
U.Parzefall, Beauty 2002, Santiago de Compostela, Jun 17-21, 2002
Inner Tracker Status Report
F.Lehner, LHCb week plenary session, CERN, May 31, 2002
The Silicon Inner Tracker for LHCb
O.Steinkamp, Instrumentation for Colliding Beam Experiments, Novosibirsk, Feb 28-Mar 6, 2002
Inner Tracker Status Report
F.Lehner, LHCb week plenary session, CERN, Feb 22, 2002

2001

Inner Tracker Status Report
O.Steinkamp, LHCb week plenary session, CERN, Dec 7, 2001
Inner Tracker Status Report
O.Steinkamp, meeting with LHCC referees, CERN, Nov 19, 2001
The LHCb Silicon Inner Tracker
F.Lehner, Vertex 2001, Brunnen, Sep 23-28, 2001
Inner Tracker Status Report
O.Steinkamp, LHCb week plenary session, Sep 21, 2001
The LHCb Silicon Inner Tracker
P.Sievers, Large Scale Applications and Radiation Hardness of Semiconductor Detectors, Firenze, Jul 4-6, 2001
Inner Tracker Status Report
O.Steinkamp, LHCb week plenary session, CERN, May 11, 2001
Submission Date Inner Tracker TDR
O.Steinkamp, meeting with LHCC referees, CERN, Mar 19, 2001
Inner Tracker Status Report
O.Steinkamp, LHCb week plenary session, CERN, Feb 16, 2001

2000

Inner Tracker Status Report
O.Steinkamp, LHCb week plenary session, CERN, Dec 1, 2000
Inner Tracker Status Report
O.Steinkamp, meeting with LHCC referees, CERN, Nov 27, 2000
Inner Tracker Status Report
P.Sievers, LHCb week plenary session, Sep 28, 2000
The LHCb Tracking System
O.Steinkamp, Symposium on LHC Physics and Detectors, Dubna, Jun 28-30, 2000
Inner Tracker Status Report
O.Steinkamp, LHCb week plenary session, CERN, May 26, 2000
Inner Tracker Status Report
O.Steinkamp, LHCb week plenary session, CERN, Feb 24, 2000


Go back to: Silicon Tracker Home Page, LHCb Home Page
Page maintained by olafs@physik.uzh.ch, last modfied on July 16, 2008